Equipment & Description of the Job Client / Plant Period

UREA SYNTHESIS REACTOR

  • Relining of 8.25 meters of cylindrical area

  • Relining of manway neck

  • Repair of liner

  • Repair of support cleats

PETROVIETNAM FERTILIZER AND CHEMICAL CORPORATION

Phu My – Vung Tau
VIETNAM

March / April 2023

AMMONIA PRIMARY REFORMER

  • Replacement of No. 288 Catalyst tubes

SOHAR INTERNATIONAL UREA AND CHEMICAL INDUSTRIES LLC

Port of Sohar
Sultanate of Oman

February / March 2023

No.1 BIMETALLIC HP UREA STRIPPER Unit 01

  • Shortening in-situ (without removing the stripper from its position)

  • Modification of the protrusion of tubes on the bottom tubesheet from 5mm to 18mm

  • Remaking of all bottom tube to tubesheet welds

IFFCO

Indian Farmers Fertilizer Co.

PHULPUR II Unit

Ghiyanagar, UP

INDIA

May / June 2022

UREA SYNTHESIS REACTOR

  • Partial relining

  • Repair and replacement of tray supports

  • Repair of existing liner

AMMONIA PRIMARY REFORMER

  • Welding of Catalyst tubes

OMIFCO

Oman India Fertilizer Company SAOC

SUR

Sultanate of Oman

March / April 2022

UREA SYNTHESIS REACTOR

  • Opening of trays, inspection and repair of liner welds

  • Installation of No. 6 new SAIPEM Supercups® trays

HP PROCESS PIPING

  • Opening and box up of HP valves and flanges

  • Modification of HP lines to improve alignment and reduce leaks

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

March 2022

No. 2 BIMETALLIC HP UREA STRIPPERS Unit 31/41

  • Shortening in-situ (without removing the stripper from its position)

  • Modification of the protrusion of tubes on the bottom tubesheet from 5mm to 18mm

  • Remaking of all bottom tube to tubesheet welds

IFFCO

Indian Farmers Fertilizer Co.

PHULPUR II Unit

Ghiyanagar, UP

INDIA

January/February 2022

UREA SYNTHESIS REACTOR

  • Relining of top dome

  • Relining of 6 courses on cylindrical area

HP PROCESS PIPING

  • Replacement of No. 9 elbows

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

June / July 2021

UREA SYNTHESIS REACTOR

  • Relining of 12.4 meters of cylindrical area

  • Repair of liner

  • Installation of supports for new Supercups tray

BRANCH OF PETROVIETNAM FERTILIZER AND CHEMICAL CORPORATION

Phu My – Vung Tau

VIETNAM

April / May 2021

UREA SYNTHESIS REACTOR

  • Partial relining

  • Repair and replacement of tray supports

  • Repair of existing liner

OMIFCO

Oman India Fertilizer Company SAOC

SUR

Sultanate of Oman

February / March 2021

TITANIUM AMMONIA CONDENSER

  • Remove of plugs

  • Partial retubing (68 tubes)

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

March 2020

TITANIUM STEAM CONDENSER

  • Removal of No. 5 tubes

  • Plugging of No. 5 + 5 holes

SABIC – Saudi Arabian Basic Company.

At

AR-RAZI

A SABIC AND JAPAN SAUDI ARABIA METHANOL COMPANY

AL JUBAIL

KINGDOM OF SAUDI ARABIA

March 2020

UREA SYNTHESIS REACTOR

  • Partial relining

  • Repair and replacement of tray supports

  • Repair of existing liner

OMIFCO

Oman India Fertilizer Company SAOC

SUR

Sultanate of Oman

February / March 2020

SOLID 25.22.2 HP STRIPPER

  • Modification of internals

  • Replacement of ferrules

HP CARBAMATE SEPARATOR

  • Repair

  • Relining

YARA ITALIA SPA

At

YARA ITALIA urea plant

FERRARA, Italy

November 2019

UREA SYNTHESIS REACTOR

  • Relining of No. 2 courses

  • Replacement of No. 2 trays

  • Replacement of No. 2 elbows in the distributors

YARA ITALIA SPA

At

YARA ITALIA urea plant

FERRARA, Italy

September / October 2019

UREA SYNTHESIS REACTOR

  • Partial relining

  • Repair

CASALE SA

At

TOGLIATTIAZOT

Togliatti

Russia

September / October 2019

UREA SYNTHESIS REACTOR

  • Replacement of neck liner and gasket seat on top manway

  • Relining of 5m

  • Repair of 100% of welds liner and tray supports

FERTILIZANTES NITROGENADOS VENEZUELA (FERTINITRO)

Barcelona

VENEZUELA

February / March 2019

UREA SYNTHESIS REACTOR

  • Installation of new SUPERCUPS® TRAY #18

PETROVIETNAM CAMAU FERTILIZER JOINT STOCK COMPANY

Ca Mau

Vietnam

August 2018

UREA SYNTHESIS REACTOR

  • Relining of 15.5m

CARBAMATE CONDENSER

  • Partial relining of channel

HP PROCESS PIPING

  • Modification

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

July / August 2018

UREA SYNTHESIS REACTOR

  • Relining of the area between tray #14 and bottom tangent line

  • Replacement of nozzle N1

CARBAMATE SEPARATOR

  • Rehabilitation

HP PROCESS PIPING

  • Repair and modification

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

April 2018

UREA SYNTHESIS REACTOR

  • Relining of top dome

  • Relining of 8.2 meters of cylindrical area

  • Repair of liner

BRANCH OF PETROVIETNAM FERTILIZER AND CHEMICAL CORPORATION

Phu My – Vung Tau

VIETNAM

November / December 2017

BIMETALLIC UREA HP STRIPPER

  • Shortening in-situ (without removing the stripper from its position)

  • Modification of the protrusion of tubes on the bottom tubesheet from 5mm to 18mm

  • Remaking of all bottom tube to tubesheet welds

KRIBHCO FERTILIZERS LTD.

PIPROLA,

Shahajahnpur, UP

INDIA

September / October 2017

BIMETALLIC UREA HP STRIPPER

  • Shortening in-situ (without removing the stripper from its position)

  • Modification of the protrusion of tubes on the bottom tubesheet from 5mm to 18mm

  • Remaking of all bottom tube to tubesheet welds

IFFCO

Indian Farmers Fertilizer Co.

AONLA Unit

Bareilly, UP

INDIA

July/August 2017

UREA SYNTHESIS REACTOR

  • Complete replacement of titanium liner by cutting and re-welding the top portion of the pressure shell

CHITTAGONG UREA FERTILIZER LTD.

Chittagong, Bangladesh.

March / July 2017

BIMETALLIC UREA HP STRIPPER

  • Shortening in-situ (without removing the stripper from its position)

  • Modification of the protrusion of tubes on the bottom tubesheet from 5mm to 18mm

  • Remaking of all bottom tube to tubesheet welds

IFFCO

Indian Farmers Fertilizer Co.

AONLA Unit

Bareilly, UP

INDIA

June / July 2016

UREA SYNTHESIS REACTOR

  • Removal and replacement of No. 1 liner course

  • Modification of carbamate inlet and solution outlet lines

YARA ITALIA SPA

At

YARA ITALIA urea plant

FERRARA, Italy

May / June 2016

UREA SYNTHESIS REACTOR

  • Complete removal and replacement of titanium liner by cutting open the pressure shell

CHITTAGONG UREA FERTILIZER LTD.

Chittagong, Bangladesh.

September / December 2015

SOLID 25.22.2 HP STRIPPER

  • Machining of the stripper tubes top end

  • Modification of the stripper ferrules

  • Design and fabrication of new grid

YARA ITALIA SPA

At

YARA ITALIA urea plant

FERRARA, Italy

September / November 2015

UREA SYNTHESIS REACTOR

  • Second phase of relining

SOLID 25.22.2 HP STRIPPER

  • Supply of ferrules for Urea Stripper

YARA ITALIA SPA

At

YARA ITALIA urea plant

FERRARA, Italy

September / November 2015

UREA SYNTHESIS REACTOR

  • Repair, modification and relining

HP PROCESS PIPING

  • Modification

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

May / June 2015

UREA SYNTHESIS REACTOR

  • Relining of 10.6m of cylindrical area.

CARBAMATE SEPARATOR

  • Rehabilitation

HP PROCESS PIPING

  • Repair and modification

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

April 2015

UREA SYNTHESIS REACTOR

  • Repair of titanium liner

CHITTAGONG UREA FERTILIZER LTD.

Chittagong, Bangladesh.

November / December 2014

UREA SYNTHESIS REACTOR

Item R501-2:

  • Replacement of all tray supports

  • Installation of new trays

  • Repair of liner welds

  • Relining of top dome

STATE COMPANY OF SOUTHERN FERTILIZERS – SCF

Khor Al Zubair

IRAQ

September / October 2014

UREA SYNTHESIS REACTOR

  • Second phase of relining – relining of lower half and bottom dome.

BANGLADESH CHEMICAL INDUSTRIES CORPORATION

At

JAMUNA FERTILIZER COMPANY LTD

TARAKANDI, JAMALPUR

BANGLADESH

June / July 2014

UREA SYNTHESIS REACTOR

Item R501-1:

  • Replacement of all tray supports

  • Installation of new trays

  • Repair of liner welds

  • Relining of top dome

STATE COMPANY OF SOUTHERN FERTILIZERS – SCF

Khor Al Zubair

IRAQ

May 2014

SOLID 25.22.2 HP UREA STRIPPER

  • Emergency repair

KOCH FERTILIZER CANADA, ULC.

Brandon (MB)

CANADA

December 2013

METHANOL CONVERTER

  • Repair and re-welding of 304H and Incoloy 800 tubes

OMAN METHANOL

Oman

December 2013

AMMONIA CONVERTER

  • Repair under Nitrogen blanket

PROMAN A.G.,

Germany

At:

CNC AMMONIA PLANT

Trinidad and Tobago

November 2013

CARBAMATE CONDENSER

  • Emergency repair

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

October 2013

TITANIUM HP UREA STRIPPER

  • Replacement of top channel

HP PROCESS PIPING

  • Modification – replacement of spools

SABIC Saudi Basic Industries Co.

At:

SAFCO IBN AL BAYTAR PLANT

Al Jubail

KINGDOM OF SAUDI ARABIA

April 2013

UREA SYNTHESIS REACTOR

  • Relining of 10.6m of cylindrical area.

HP PROCESS PIPING

  • Replacement of reactor-o-stripper and carbamate separator-to-reactor line

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

November 2012

UREA SYNTHESIS REACTOR

  • Relining of 8m of cylindrical area

HP PROCESS PIPING

  • Modification, replacement of elbows and spools

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

September 2012

AMMONIA CONVERTER

  • Extensive repair

HP PROCESS PIPING

  • Partial replacement

KAFCO

Karnapuli Fertilizer Company LTD.

Chittagong

BANGLADESH

May 2012

TITANIUM HP UREA STRIPPER

  • Emergency repair of titanium liner

SABIC Saudi Basic Industries Co.

At:

SAFCO IBN AL BAYTAR PLANT

Al Jubail

KINGDOM OF SAUDI ARABIA

January / February 2012

UREA SYNTHESIS REACTOR

  • Relining of top dome and 8m of cylindrical portion

YARA ITALIA SPA

At

YARA ITALIA urea plant

FERRARA, Italy

May / June 2011

TITANIUM HP UREA STRIPPER

  • Relining of top channel

SABIC Saudi Basic Industries Co.

At:

SAFCO IBN AL BAYTAR PLANT

Al Jubail

KINGDOM OF SAUDI ARABIA

April / May 2011

UREA SYNTHESIS REACTOR

  • Replacement of top manway liner and gasket seating ring

SABIC Saudi Basic Industries Co.

At:

SAFCO IBN AL BAYTAR PLANT

Al Jubail

KINGDOM OF SAUDI ARABIA

April 2011

ZIRCONIUM HP UREA STRIPPER

  • Inspection and repair.

PROFERTIL

Bahia Blanca

ARGENTINA

September

2010

UREA SYNTHESIS REACTOR

  • Relining of Urea Total Recycle Secondary Reactor.

KOCH FERTILIZER CANADA, ULC.

Brandon (MB)

CANADA

June / July 2010

UREA SYNTHESIS REACTOR

  • Relining of top dome and of 22.5 meters of the cylindrical portion.

  • Supply of bolts, nuts and washers for the sieve trays.

BANGLADESH CHEMICAL INDUSTRIES CORPORATION

At

JAMUNA FERTILIZER COMPANY LTD

Tarakandi, Jamalpur

BANGLADESH

April / May 2010

UREA SYNTHESIS REACTOR

  • Relining of the area included between tray #1 and tray #5.

  • Repair of liner welds.

HP PROCESS PIPING

  • Modification of high pressure piping for the installation of a new stripper.

BIMETALLIC HP UREA STRIPPER

  • Repair of the tube-to-tubesheet welds and the channel liner of the old stripper

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

February / March 2010

TITANIUM HP UREA STRIPPER

  • Repair of liner and tube-to-tubesheet welds and replacement of cover strips.

CHONGQING JIANGFENG CHEMICAL COMPANY

Baitao Town, Fuling District, Chongqing

CHINA

November 2009

UREA SYNTHESIS REACTOR

  • Supply and installation of top hoist.

  • Repair of liner welds.

  • Supply and installation of No. 5 new sieve trays.

  • Supply of material for overflow pipe.

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

August 2009

UREA SYNTHESIS REACTOR

  • Emergency repair of the liner welds.

 

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

December 2007 /

January 2008

UREA SYNTHESIS REACTOR

  • Replacement of the gasket seating ring on the manhole flange.

  • Relining of the top dome and 1.5 meters of the cylindrical portion.

  • Repair of liner welds.

  • Supply and installation of No. 9 new sieve trays.

BIMETALLIC HP UREA STRIPPER

  • Repair of tube-to-tubesheet welds.

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

November 2007

UREA SYNTHESIS REACTOR

  • Relining of 7.5 meters of the cylindrical portion between tray #5 and tray #9.

  • Supply and installation of load-limiting device for the top hoist.

TITANIUM HP UREA STRIPPER

  • Relining of the top channel.

SABIC Saudi Basic Industries Co.

At:

SAFCO IBN AL BAYTAR PLANT

Al Jubail

KINGDOM OF SAUDI ARABIA

June 2007

AMMONIA PRIMARY REFORMER

  • Re-design and replacement of No. 1 complete coil

  • Replacement of No. 2 headers and No. 1 row of finned tubes on a second coil

  • Replacement of No. 1 header in a third coil.

SOLID 25.22.2 HP STRIPPER

  • Modification of gasket type from Delta to Cam Profile, with replacement of the gasket seating ring, on the high pressure flanges.

  • Supply of ferrules and ferrule stay grid for No. 2 strippers.

UREA SYNTHESIS REACTOR

  • Modification of gasket type from Delta to Cam Profile, with replacement of the gasket seating ring, on the manhole flange.

YARA ITALIA SPA

Ferrara

ITALY

October 2006

UREA SYNTHESIS REACTOR

  • Repair of tray supports

FERILIZANTES NITROGENADOS DE VENEZUELA (FERTINITRO)

Barcelona, VENEZUELA

October 2005

UREA SYNTHESIS REACTOR

  • Installation of load-limiting device in the reactor’s top hoist.

  • Installation of new liner strips over the existing liner at tray #13 and #14 elevation.

  • Repair of liner welds.

  • Replacement of overflow pipe.

H.P. PROCESS PIPING

  • Replacement of stub ends

BIMETALLIC H.P. UREA STRIPPER

  • Repair of bimetallic stripper tube-to-tubesheet welds.

GPIC

Gulf Petrochemical Industries Co.

Al-Manama, BAHRAIN

June 2005