Description of the Job / Contract

Client / Plant

Period

Approximate value, EURO

Installation of load-limiting device in the reactor’s top hoist.

Istallation of new ilner strips over the existing

liner at tray #13 and #14 elevation.

Repair of reactor liner welds.

Replacement of overflow pipe.

Replacement of stub ends in the reactor and

stripper high pressure piping.

Repair of bimetallic stripper tube-to-welds.

GPIC

Gulf Petrochemical Industries Co.

Al-Manama, BAHRAIN

June 2005

180.000,00

Repair of reactor tray supports

Ferilizantes Nitrogenados de Venezuela

(FERTINITRO)

Barcelona, VENEZUELA

October 2005

7.000,00

Modification of gasket type from Delta to Cam Profile, with replacement of the gasket seating ring, on the high pressure flanges of No. 2 strippers.

Modification of gasket type from Delta to Cam Profile, with replacement of the gasket seating ring, on the manhole flange of Urea Reactor.

Supply of ferrules and ferrule stay grid for No. 2 strippers.

Re-design and replacement of No. 1 complete coil; replacement of No. 2 headers and No. 1 row of finned tubes on a second coil, replacement of No. 1 header in a third coil of the ammonia reformer.

YARA ITALIA SPA

Ferrara

ITALY

October 2006

600.000,00

Relining of 7.5 meters of the cylindrical portion of Urea Reactor (between tray #5 and tray #9).

Supply and installation of load-limiting device for the reactor hoist.

Relining of the titanium stripper top channel.

SABIC Saudi Basic Industries Co.

At:

SAFCO Ibn Al Baytar Plant

Al Jubail

KINGDOM OF SAUDI ARABIA

June 2007

320.000,00

Replacement of the gasket seating ring on the Urea Reactor manhole flange.

Relining of the top dome and 1.5 meters of the cylindrical portion of Urea Reactor.

Repair of Urea Reactor liner welds.

Supply and installation of No. 9 new sieve trays for Urea Reactor.

Repair of bimetallic stripper tube-to-tubesheet welds.

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

November 2007

410.000,00

Emergency repair of one of the Urea Reactor liner welds.

Petronas Fertilizer (Kedah) SDN BHD

Gurun. Kedah

Malaysia

From December 2007

To January 2008

35.000,00

Supply and installation of the Urea Reactor top hoist.

Repair of Urea Reactor liner welds.

Supply and installation of No. 5 new sieve trays for Urea Reactor.

Supply of material for Urea Reactor overflow pipe.

Petronas Fertilizer (Kedah) SDN BHD

Gurun. Kedah

Malaysia

August 2009

460.000,00

Repair of titanium stripper and replacement of cover strips.

Chongqing Jiangfeng Chemical Co., LTD.

Baitao Town, Fuling District, Chongqing

CHINA

November 2009

40.000,00

Relining of Urea Reactor in the area included between tray #1 and tray #5.

Repair of urea reactor liner welds.

Modification of high pressure piping for the installation of a new stripper.

Repair of the tube-to-tubesheet welds and the channel liner of the existing bimetallic stripper.

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

From February to March 2010

400.000,00

Relining of top dome and of 22.5 meters of the cylindrical portion of Urea Reactor.

Supply of bolts, nuts and washers for Urea Reactor sieve trays.

Bangladesh Chemical Industries Corporation

At

Jamuna Fertilizer Company LTD

Tarakandi, Jamalpur

BANGLADESH

From April to May 2010

1.100.000,00

Relining of Urea Total Recycle Secondary Reactor.

Koch Fertilizer Canada, ULC.

Brandon (MB)

CANADA

From June to July 2010

180.000,00