Description of the Job / Contract
|
Client / Plant
|
Period
|
Approximate value, EURO
|
|
Installation of load-limiting device in the reactor’s top hoist.
Istallation of new ilner strips over the existing
liner at tray #13 and #14 elevation.
Repair of reactor liner welds.
Replacement of overflow pipe.
Replacement of stub ends in the reactor and
stripper high pressure piping.
Repair of bimetallic stripper tube-to-welds.
|
GPIC
Gulf Petrochemical Industries Co.
Al-Manama, BAHRAIN
|
June 2005
|
180.000,00
|
|
Repair of reactor tray supports
|
Ferilizantes Nitrogenados de Venezuela
(FERTINITRO)
Barcelona, VENEZUELA
|
October 2005
|
7.000,00
|
|
Modification of gasket type from Delta to Cam Profile, with replacement of the gasket seating ring, on the high pressure flanges of No. 2 strippers.
Modification of gasket type from Delta to Cam Profile, with replacement of the gasket seating ring, on the manhole flange of Urea Reactor.
Supply of ferrules and ferrule stay grid for No. 2 strippers.
Re-design and replacement of No. 1 complete coil; replacement of No. 2 headers and No. 1 row of finned tubes on a second coil, replacement of No. 1 header in a third coil of the ammonia reformer.
|
YARA ITALIA SPA
Ferrara
ITALY
|
October 2006
|
600.000,00
|
|
Relining of 7.5 meters of the cylindrical portion of Urea Reactor (between tray #5 and tray #9).
Supply and installation of load-limiting device for the reactor hoist.
Relining of the titanium stripper top channel.
|
SABIC Saudi Basic Industries Co.
At:
SAFCO Ibn Al Baytar Plant
Al Jubail
KINGDOM OF SAUDI ARABIA
|
June 2007
|
320.000,00
|
|
Replacement of the gasket seating ring on the Urea Reactor manhole flange.
Relining of the top dome and 1.5 meters of the cylindrical portion of Urea Reactor.
Repair of Urea Reactor liner welds.
Supply and installation of No. 9 new sieve trays for Urea Reactor.
Repair of bimetallic stripper tube-to-tubesheet welds.
|
GPIC
Gulf Petrochemical Industries Co.
Al-Manama
BAHRAIN
|
November 2007
|
410.000,00
|
|
Emergency repair of one of the Urea Reactor liner welds.
|
Petronas Fertilizer (Kedah) SDN BHD
Gurun. Kedah
Malaysia
|
From December 2007
To January 2008
|
35.000,00
|
|
Supply and installation of the Urea Reactor top hoist.
Repair of Urea Reactor liner welds.
Supply and installation of No. 5 new sieve trays for Urea Reactor.
Supply of material for Urea Reactor overflow pipe.
|
Petronas Fertilizer (Kedah) SDN BHD
Gurun. Kedah
Malaysia
|
August 2009
|
460.000,00
|
|
Repair of titanium stripper and replacement of cover strips.
|
Chongqing Jiangfeng Chemical Co., LTD.
Baitao Town, Fuling District, Chongqing
CHINA
|
November 2009
|
40.000,00
|
|
Relining of Urea Reactor in the area included between tray #1 and tray #5.
Repair of urea reactor liner welds.
Modification of high pressure piping for the installation of a new stripper.
Repair of the tube-to-tubesheet welds and the channel liner of the existing bimetallic stripper.
|
GPIC
Gulf Petrochemical Industries Co.
Al-Manama
BAHRAIN
|
From February to March 2010
|
400.000,00
|
|
Relining of top dome and of 22.5 meters of the cylindrical portion of Urea Reactor.
Supply of bolts, nuts and washers for Urea Reactor sieve trays.
|
Bangladesh Chemical Industries Corporation
At
Jamuna Fertilizer Company LTD
Tarakandi, Jamalpur
BANGLADESH
|
From April to May 2010
|
1.100.000,00
|
|
Relining of Urea Total Recycle Secondary Reactor.
|
Koch Fertilizer Canada, ULC.
Brandon (MB)
CANADA
|
From June to July 2010
|
180.000,00
|
|