Replacement of the steam heated coils in No. 1 dryer.

SIA SRL

Gruppo Mauro Saviola

Viadana (MN)

ITALIA

August 2005

70.000,00

Fabrication on site and installation of No. 3 dryers with steam heated coil, diameter 5.4 meters, length 28 meters, weight 340 tons.

FRITZ EGGER GmbH

Unterradlberg,

Skt. Pölten,

AUSTRIA

From March 2008

To June 2010

2.700.000,00

Removal of the existing internals and installation of new internals in No. 1 dryer

BÜTTNER GmbH

Per:

FALCO SPA

Gruppo TROMBINI

Codigoro (FE)

ITALIA

August 2008

100.000,00

Complete revamping of the drying section

SIA SRL

Gruppo Mauro Saviola

Viadana (MN)

ITALIA

From February to March 2009

175.000,00

Repair of combustion chamber

Repair of mixing chamber

SIA SRL

Gruppo Mauro Saviola

Viadana (MN)

ITALIA

April 2009

40.000,00

Installation of internals in No. 1 dryer

BÜTTNER GmbH

Per:

EGGER Panneaux & Décors

Rion des Landes

FRANCIA

June 2009

75.000,00

Manufacturing and installation of No. 4 cyclones.

SIA SRL

Gruppo Mauro Saviola

Viadana (MN)

ITALIA

From June to August 2009

140.000,00

Miscellaneous plant maintenance works

SIA SRL

Gruppo Mauro Saviola

Viadana (MN)

ITALIA

From January to February 2010

40.000,00

Installation of internals in No. 1 dryer

BÜTTNER GmbH

Per:

EC Bioenergie GmbH

Bicken

GERMANIA

July 2010

60.000,00

Removal of existing internals and installation of new internals in No. 1 dryer.

M. KAINDL HOLZINDUSTRIE

Wals Salzburg

AUSTRIA

From July to August 2010

90.000,00