| We can organize the fabrication on site of welded equipment when the dimension of the equipment itself or the logistic of the site do not permit the transportation. |
|

|

|
|

|
| Fabrication on site of No. 3 dryers 5,4 meters in diamater and 340 tons in weight, equipped with internal steam heated coils. |
|
|
|